What to Expect During HVAC Installation

HVAC Installation Day – What to Expect!

Site Assessment First

Assessing the installation site for the new HVAC system for your home or business will help ensure your system is properly sized to handle the unique local climate conditions for your area. HVAC systems need a good amount of space for proper airflow to and from the unit. The engineer will need to measure your space for proper sizing and assess the insulation of your home.

Equipment Delivery and Clearance

We will need a 2′ space around the installation location for delivery of the unit. Make sure all access locations for our equipment are clear of clutter such as furniture, etc. to ensure the smoothest possible delivery and safest installation of your new HVAC system.

Removing the Old Kit

For HVAC systems, the engineer will disconnect and remove your existing air conditioning, heat or ventilation equipment from your building and safely dispose of it for you. Note that how your old air conditioning, heat or ventilation equipment’s refrigerant is disposed of is of concern to us. We will make sure that it is recovered safely from your old air conditioning, heat or ventilation equipment rather than being released into the atmosphere as a gas.

The Installation Itself

After all of the parts have arrived at your site, the actual installation of the new HVAC system will begin. The fitting of parts, such as the wiring and any required duct connections will be completed in a certain order in order to ensure proper indoor air quality.

Testing and Commissioning

Testing of new HVAC systems will typically include a test for duct-leakage or airflow test and verification that the installed system will achieve the required temperature. For HVAC installation in the Williamsport area of PA will include specifics on this phase of work. There is more on HVAC Williamsport PA at https://qualityairmechanical.com/hvac/.

Handover and Documentation

They will want to see a copy of the warranty, the filter change schedule and the engineers signature for the commissioning on their handover documentation.

Preparing for each stage of the process will save time and get the right system up and running for you on the day of the installation.